Time Spent: 3 hours
Total Time: 27 hours
My last day was at Dragonfly Creek and it was one of the most challenging days. It was really sunny out and the first part of our work involved a lot of physical labor. What we had to do was take some of the soil out, using tools such as shovels and rakes, and put the soil onto some tarp. We then had to carry the tarp up to the truck and dump the soil there.
No comments:
Post a Comment